top of page
Business meeting

CLIENTS & RESULTS

Verified savings, cycle-time reductions, and throughput gains. 

Stop guessing at your margins. We install the systems that turn operational chaos into verified bottom-line results.

Proof you can verify. Results tracked with baselines + weekly scoreboards.

$5.62M

Verified with Finance

(PG&E)

Billing cycle

8 days  →  2 hours

(Corovan)

Margins

9%  →  24%

in 12 months

On-Time-to-Release

43%  →  90%

Scheduling & Dispatch

Each result includes a baseline, actions, and measurement.

CASE STUDIES

LA Hydro-Jet field service crew at work, customer feedback and field-to-office system

LA Hydro-Jet

LA Hydro-Jet

Problem: A 35-year legacy brand was struggling with inconsistent customer feedback (3.6-star rating across 132 reviews) and lacked a repeatable field-to-office system, losing market share to competitors.

PG&E field operations, daily management system behind $5.62M verified savings

PG&E

PG&E

WHAT WE DID: Isolated primary cost drivers and re-engineered field workflows. Installed a Daily Management System to maintain labor efficiency.

Corovan dispatch-to-cash billing process, billing time cut from 8 days to 2 hours

Corovan

Corovan

WHAT WE DID: Mapped the 'Dispatch-to-Cash' process to identify bottlenecks. Implemented Standard Work and real-time KPIs to collapse billing lag from over a week to under two hours.

Corovan job costing and weekly scoreboard, margins improved from 9% to 24%

Corovan

Corovan

WHAT WE DID: Aggressively removed process waste and tightened job-costing accuracy. Implemented weekly scoreboards to give leadership 100% visibility into project profitability.

Pacific Scientific material release, on-time performance improved from 43% to 90%

Pacific Scientific

Pacific Scientific

WHAT WE DID: Clarified ownership of material release, corrected the planning logic, and installed a daily shortage-management cadence so jobs released on time.

Cobham AES Lean cell with standard work and daily management routines

Cobham

Cobham AES

WHAT WE DID: Designed and deployed high-performance Lean cells. Established standard work protocols and daily management routines to ensure consistent, predictable output.

Industries Served
Electrical Contractors
Field Service
Utilities
Manufacturing

Is your process hiding similar results?

bottom of page